Services & fees

Everything from survey to snag list.

Six services, three packages, one method. Take the whole build or just the part you cannot do yourself — we are happy to hand drawings to your own contractor.

What we do

Six services

All of it happens in-house except construction, which is delivered by contractors we tender and then supervise on your behalf.

01

Residential blockwork

HDB flats, condominiums and landed homes. Space planning, storage walls, platform floors, wet areas and the full finishes package.

  • Layout options on a 300 mm grid
  • Storage audit — litres, not vibes
  • Lighting & power planning
02

Café, retail & workspace

Shophouse F&B, showrooms, clinics and studios. Queue logic, service routes and finishes that survive a hundred people a day.

  • Seat counts & circulation testing
  • Licensing-aware planning support
  • Shopfront & signage design
03

1:1 in-game previews

Your project rebuilt to scale in a voxel world. Walk it on your laptop, move a wall, and see the change before it costs money.

  • Walkable model, one block = 100 mm
  • Two revision rounds included
  • Shareable with family or investors
04

Palette curation

The nine-block hotbar: materials, colours, hardware and lighting temperature, documented so any contractor can price it correctly.

  • 100 mm sample cubes couriered to you
  • Finish schedule & care sheet
  • Supplier list with lead times
05

Custom joinery

Carcass drawings, shadow gaps, hinge selection and hardware. Built by two workshops in Kaki Bukit that have never missed a delivery.

  • Shop drawings at 1:10 and 1:1 details
  • Factory visit before delivery
  • Moisture-aware construction for SG
06

Build supervision

Tender, award, then weekly site walks with a photo log every Friday and a snag list written in plain language.

  • Two-contractor competitive tender
  • Weekly progress reports
  • 90-day post-handover check-in

Packages

Three ways to start

Indicative fees in Singapore dollars, excluding GST and construction cost. Every proposal is fixed-fee — we do not bill hourly surprises.

Block Starter

from S$3,800

One room · design only

  • Site survey & measured plan
  • Two layout options
  • Nine-block palette + sample cubes
  • Furniture & fittings shopping list
  • One revision round
Enquire

Full Craft

from S$14,500

Whole home · most chosen

  • Everything in Block Starter
  • 1:1 walkable voxel preview
  • Full craft drawings & tender pack
  • Two-contractor tender & award
  • Weekly site walks to handover
  • Care sheet, spares & 90-day review
Start a build

Commercial Build

On request

Café, retail, clinic, office

  • Feasibility & seat-count study
  • Licensing & submission coordination
  • Kitchen or back-of-house planning
  • Brand, shopfront & signage
  • Phased handover for trading sites
Talk to us

Renovation works are contracted directly between you and the builder. We tender, recommend and supervise — so the person checking the work is not the person invoicing for it.

Nine cubic material samples in a grid: oak, stone, terracotta, moss, sandstone, basalt, copper, frosted glass and rattan.
Nine-block hotbar · 100 mm sample cubes

The method

Why nine blocks

Rooms go wrong when there are too many decisions. Fixing the palette at nine materials forces every element to justify itself, keeps quotations comparable between contractors, and makes the finished space readable the moment you walk in.

It is also how block-game builders work: a limited inventory, used well, beats an infinite one used carelessly.

  • 300 mm planning grid
  • 9-material limit
  • 2 lighting temperatures
  • 1 hero surface per room

Good questions

Before you enquire

Do I have to like Minecraft for this to work?

No. Most clients come to us for the storage and the calm. Block logic is a design method — modular, honest, repeatable — and we can dial the reference from obvious to almost invisible. Several of our homes read simply as warm, well-organised interiors.

Can you work with a contractor we already have?

Yes. We can stop at the craft-drawings stage and hand over a tender pack your builder can price directly, or stay on for supervision only. Fees adjust accordingly.

How long does a typical home take?

Fourteen to twenty weeks from first survey to keys, of which design is roughly eight. Shophouse and heritage work usually adds four to six weeks for submissions.

Do you handle HDB and management approvals?

We prepare the drawings and coordinate with the contractor who holds the licence for HDB permits, and we deal with condominium management submissions ourselves.

Fixed fees, no surprises

Get a scope and a number

Send the plan and budget. You get a written scope, a fixed fee and a week-by-week timeline within two working days.