Voxel interiors · Singapore

Interiors built block by block.

Ukiyocraft Studio is a Singapore design practice with one obsession: translating the calm, honest geometry of block-game worlds into rooms you can actually live in. Chunky forms, real materials, no plastic gimmicks.

Living room with oak-plank block walls, a stone block feature wall and a low moss-green sofa, overlooking a hazy city skyline.
Tiong Bahru maisonette · 92 sqm · completed 2026
42Builds delivered
6Years on site
18Block palettes curated
1:1In-game previews

What we craft

Three ways we put blocks to work

Every project starts as a grid: a plan drawn in 300 mm modules, then built in real timber, stone and steel by joinery partners we have worked with for years.

All services
01

Residential blockwork

HDB flats, condos and landed homes. Modular storage walls, platform floors and built-in seating that hide the mess and keep the room quiet.

02

Café, retail & studio

Shophouse coffee bars, ateliers and showrooms. Durable finishes, sensible service routes and a facade people photograph without being asked.

03

1:1 in-game previews

Before anything is cut, we rebuild your home to scale in a voxel world you can walk through. Change a wall in the evening, approve it the same night.

Material palette

Nine blocks. One room.

Each project gets a hotbar: nine materials, no more. It keeps quotations honest, joinery repeatable, and the finished room legible from the doorway.

  • Oak plank — European oak, brushed, matte hardwax
  • Warm stone — honed granite & microcement
  • Terracotta — unglazed tile, 200 mm square
  • Moss — planting, wool felt, painted joinery
  • Copper — unlacquered hardware that ages
Nine cubic material samples arranged in a grid: oak, stone, terracotta, moss, sandstone, basalt, copper, frosted glass and rattan.
Studio sample cubes · 100 mm · shipped to every client

How a build happens

Six phases, one XP bar

Typical residential timeline is 14 to 20 weeks from first survey to handover. You always know which phase you are in and what is due next.

01

Survey

We measure everything, photograph the sun path and note the awkward beam nobody mentions. Laser scan for anything over 100 sqm.

Week 1 · on site
02

Block-out

Plans drawn on a 300 mm grid and rebuilt as a voxel model. Two layout options, walked through together on a call.

Weeks 2–4 · studio
03

Palette lock

Nine materials chosen, sample cubes couriered to you, lighting temperatures fixed. Nothing changes after this without a note.

Week 5 · samples
04

Craft drawings

Joinery details, electrical marks, tile setting-out and a full tender pack. Priced by two contractors so you can compare like for like.

Weeks 6–8 · documentation
05

Build

Weekly site walks, photo logs every Friday, and a snag list you can actually read. We chase the contractor so you do not have to.

Weeks 9–18 · on site
06

Handover

Care sheet for every finish, spare tiles boxed and labelled, and a 90-day check-in to fix whatever the first months reveal.

Weeks 19–20 · keys

Client notes

What people say after handover

We asked for something our son would think was cool and our parents would think was tasteful. Somehow the same oak wall did both jobs.
Residential client · Tiong Bahru maisonette
Walking the café in-game caught two mistakes before tender — the bar was too deep and the queue blocked the door. That preview paid for itself twice.
Owner · Terracotta Corner Café, Joo Chiat

Next build

Ready to place the first block?

Tell us the address, the rough budget and when you need the keys back. We reply within two working days with a scope, a fee and an honest timeline.